Richmond Lock Footbridge Update
| 05-Jul-04 |
|
Richmond Lock Footbridge Update The footbridge at Richmond Lock has now reopened to the public - ahead of schedule. The footbridge has been closed since May for a major programme of repainting and other urgent repair and preservation works. Members of the public are able to use the footbridge between the following times: Summer (BST) 6.30am - 9.30pm Outside these times the gates at either end of the footbridge will be locked shut. |
|
Ends |
| << Back to Archived PLA News |
www.pla.co.uk/news 17/05/2012
