River Works Licence Applications Received

Current list of River Works Licence applications received

Last update - 9/5/2012

PLA Ref No. Location Description of proposed works Date received Status Decision
AN/30/472 Lee Tunnel Outfall culvert 21/05/08 In progress  
AN/14/347 Watermans Quay, Fulham Riverwall repairs 22/09/08 In progress  
AS/33/18 Mulberry Wharf demo 2 mooring piles & pipeline 22/08/08 In progress  
AN/02/46-7 Twickenham Emb. Install fenders 02/09/08 In progress  
AN/01/10 99 Strawberry Vale, Twickenham Pontoon,brow & 2x piles  0809/08 In progress  
A2/20/2 Blackfriars Bridge Extension monitoring 10/09/08 Consent granted  
A2/40/36 Denton, Gravesend 2 mooring piles 12/09/08 In progress  
AN/79/42 Kingsbridge Whf,Barking Creek Remedial works 08/09/08  In progress  
 AS/07/25  Kew embankment  Remedial works  03/12/08 In progress  
AN/30/467 Gallions Point, Lead In Jetty jetty head & extension 19/11/08 In progress  
AS/15/101 & AS/30/101 Barnes - Beckton ST Works Boreholes 10/12/08 In progress  
A2/09/1 Barnes Railway Bridge Scaffold 18/12/08 In progress  
A2/83/36 Holehaven new works - mooring 14/01/09 In progress  
AS/33/20 Church Manorway, Erith jetties, moorings, piles & ramp 24/01/09 In progress  
AEP/02/5 Eel Pie Island, Twickenham 2 mooring posts 26/01/09 In progress  
AS/22/208 Unity Wharf 3 overhanging balconies (crane & lockum) 03/02/09 In progress  

AS/33/25

Erith construction of new steel jetty 10/02/09

In progress

 

AN/34/76-7 Mar Dyke, Purfleet public foot & cycle path bridge 25/02/09 Consent granted  
A2/43/126 Shellhaven install 20 piezometers 06/03/09 Consent granted  
AS/14/121-122 Oyster Wharf, Battersea install piles, pontoon & access bridge 20/03/09 Consent granted  
AN/35/84 Purfleet Pier jetty & various other works 11/03/09 In progress  
AS/29/517 Woolwich Woolwich free ferry 08/04/09 In progress  
AS/39/104-112 Bevans Wharf, Northfleet demolition of jetty crane & 3 chimneys 06/02/09 Consent granted  
AN/23/204-7 Metropolitan Wharf, Wapping Platform & loading lophole platforms 18/02/09 In progress  
AN/23/223 Phoenix Wharf balconies 27/04/09 In progress  
AS/76/17&18 46&47 49&51 AS/79/13 Deptford Creek flood defence repairs to 7 frontages/river walls 22/04/09 Consent granted  
AN/10/271 London, W6 2 moorings 05/05/09 Consent granted  
A2/20/2 Blackfriars repair, widen, & strengthen rail bridge 20/05/09 Consent granted  
A2/83/36 Holehaven Creek mooring no. 118 01/06/09 Consent granted  
A2/83/36 Holehaven Creek mooring no. 124 04/06/09 Consent granted  
AN/02/59 Twickenham steel pontoon, cone top & catwalk 08/06/09 In progress  
AS/76/28-29 & AS/76/30-31 Sun Wharf & Theatre Wharf repair of river wall 08/06/09 Consent granted  
AN/4/114A Isleworth barge grid 13/06/09 In progress  
AS/38/95 Britannia Refined Metals Wharf 9 piles & sheet piling 11/06/09 Consent granted  
AN/11/304-7 Thames Wharf & Palace Wharf flood defence repairs 03/07/09 Consent granted  
AS/15/146-7 Albion Riverside (Coupers Quay) moorings, gangways & walkways for barges 21/07/09 In progress  
AS/40/164 Gordon Promenade, Gravesend beach shingle replenishment 31/07/09 Consent granted  
 AN/14/344B Fulham Wharf pipes, concrete apron & pile supports  01/04/09 Consent granted  
 AS/15/130 Valiant House, Wandsworth removal of vegetation and repair marine wall  03/08/09 Consent granted  
AS/27/445-451 Syral UK, Greenwich demolition of silos & jetty 14/09/09 Consent granted  
AN/32/46A & AN/32/40A Dagenham pumping stations 03/09/09 Consent granted  
AN/06/148 & AN/06/150B Soaphouse Creek & River Brent, Brentford installation of leisure and commercial moorings 15/10/09 Consent granted  
AN/14/344A & AS/13/103 Wimbledon to Kensal Green Construction of cable tunnel 04/11/09 Consent granted  
AS/40/145 Town Pier, Gravesend Installation of pontoon 03/11/09 Consent granted  
A2/85/22 Benfleet Creek installation of new mooring 07/11/09 Consent granted    
AN/79/7, AN/31/33A & AN/32/49 Oakentrough & Whitings Sluice, Barking - Buzzards Creek - Havering Sluice Refurbishment to tidal sluices 12/11/09 Consent granted    
AS/10/57 Londsdale Road, London SW1 refurb & redev and proposed new outfall 25/11/09 Consent granted    
AS/81/35 - AS/81/40A Dartford Creek realignment of flood wall and construction of new new walkway 25/11/09 Consent granted    
AN/15/361 Lots Road masonry replacement & repointing of river wall 09/12/09

Consent granted

 

   
AN/44/137 Canvey Island maintenance repairs & strengthening of Oikos Jetty No. 1 09/12/09 Consent granted    
 AN/79/42-3 Kingsbridge Ind. Est. Barking extended works to frontages  02/12/09 Consent granted    
 AN/78/23  Orchard Wharf  flood defence improvements  01/12/09  Consent granted    
 AN/02/69A  Twickenham change of use to Passenger Pier  03/02/10  Consent granted    
AS/03/08 Twickenham new toilet facilities on pontoon 07/12/09 Consent granted    
AS/34/56A Erith removal of Clubship & installation of pontoon 17/02/10 Consent granted  pontoon installed & ship removed  
AS/33/25 Erith proposed new outfall & stilling basin 24/02/10 Consent granted    
AN/76/36-50 Deptford Creek various works 03/02/10 Consent granted    
AS/27/441 Pipers Barge Road screw to be placed to lower end of mooring 04/03/10 Consent granted    
AN/85/36 Benfleet Creek houseboat 'Beetroot' 17/02/10 Consent granted    
AN/85/36 Benfleet Creek houseboat 'Altair' 01/02/10 Consent granted    
AN/15/359 Chelsea Harbour houseboat 'Tangoroa' 22/03/10 Consent granted    
AS/40/147 St Andrews Tier, Gravesend Variation - single mooring to 3 point trot mooring 25/03/10 Consent granted    
AS/13/84-85 Wandsworth permanent residential moorings 09/03/10 Consent granted    
AN/06/172-3 Kew Road Bridge, Brentford Surface Water Outfall 09/04/10 Consent granted    
AN/36/87 Purfleet 10 new moorings 12/04/10 Consent granted    
AS/29/489 AS/27/448 & 450 Vaizeys/Morden & Primrose Wharves flood defence repairs & scoping report 26/04/10 Consent granted    
A2/84/41 East Haven Creek Saline lagoon 20/04/10 Consent granted    
AN/03/104A 8A Ducks Walk, Twickenham Installation of campsheeting & reinforcement of decayed timber piling 28/04/10 Consent granted    
AN/06/79 Barking Creek Construction of site drainage outfall 17/05/10 Consent granted    
 AS/26/354  Borthwick Street  slipway reinstatement  01/04/10 Consent granted    
 AN/20/134  Swan Lane Pier  removal of 'Regalia'  10/06/10 Consent granted    
A2/83/36 Holehaven Creek relocation of buoy 17/06/10 Consent granted    
AN/06/172-3 Kew Bridge Road installation of cantilever brow/shallow draft pontoon 12/07/10 Consent granted    
AS/17/36 St George Wharf passenger pier, bankseat, fixed bridge, access brow, pontoon 02/07/10 Consent granted    
AN/10/276 Hammersmith Boathouse removal of pontoon 16/07/10 Consent granted    
AN/1/9 101 Strawberry Vale, Twickenham removal of works - ladder and runners to remain 09/07/10 Consent granted    
AS/29/517 Woolwich Free Ferry installation of piled berthing dolphin 10/07/10 Consent granted    
AS/20/151 Winchester Wharf installation of 10 balconies 30/07/10 Consent granted    
AN/06/154 Paxtons boat yard, Lots Ait 3 moorings 22/07/10 Consent granted    
AN/26/339 Ferry Street (Poplar Blackwell & District rowing club) extension to slipway 02/08/10 'On hold'    
AN/06/173 Kew Bridge rowing pontoon installation of cantilever brow & shallow draft pontoon 12/07/10 In progress    
AN/26/339 River Thames frontage, Ferry St extension to slipway 02/08/10 In progress    
AN/21/139 London Bridge construction of staircase & footbridge 01/09/10 Consent granted    
AS/40/145 Town Pier, Gravesend  new pontoon 17/09/10 Consent granted    
AN/36/93 Vopak Terminal extension of Jetty No. 2 26/08/10 Consent granted    
A2/85/36 Benfleet Creek new wooden staging/jetty & houseboat 'Budhari' 17/09/10 Consent granted    
AN/85/06 Benfleet Creek removal of timber jetty & steel barge.  replace with floating pontoon 09/09/10 In progress    
AS/33/25 Erith new jetty 16/09/10 Consent granted    
A2/32/36 Halfway Reach, Belvedere reposition of 2 mooring buoys & replace with mooring barge on swing mooring 08/10/10 Consent granted    
AS/20/157 Queens Walk, Southwark erection of new gangplank & pavillion 06/10/10 In progress    
AN/06/154 Lots Ait construction of steel pedestrian bridge 13/10/10 Consent granted    
AS/39/120 Old Sun Wharf, Northfleet construction of small jetty 15/10/10 Consent granted    
AS/40/176 Denton reinstatement of mooring buoy/new chain 18/10/10 Consent granted    
AS/29/495 Herringham Jetty, Charlton installation of pontoons 23/10/10 In progress    

 

AS/37/89

Ingress Park, Greenhithe existing outfall & extension 30/11/10 Consent granted    
AS/26/416 Cutty Sark Gardens 450mm outfall & flap valve 22/11/10 Consent granted    
AS/40/145 Town Pier, Gravesend variation to pontoon 27/11/10 In progress    
AN/06/148 River Brent Lead-in structure (4 steel piles with timber cross beams) 15/12/10 Consent granted    
AS/20/157 Queens Walk, Southwark erection of new gangplank from existing pontoon 23/12/10 In progress    
AN/28/419 Bugsby's Reach London Cable Car 12/01/11 Consent granted    
AS/29/495 Herringham Jetty 4 moorings & change of use 25/01/11 In progress    
AN/33/52 Rainham Creek repair tidal defence 25/01/11 Consent granted    
AS/39/104 Bevans Wharf temporary change of use to berthing of a cruise liner during the Olympics 19/01/11 In progress    
AEP/2/9 The Ripple, Eel Pie Island Variation to non-user 30/01/11 Consent granted    
A2/46/102 Gunfleet Sands demo project - 2 turbines 03/02/11 Consent granted    
AS/10/57 Hammersmith construction of a surface water outfall 29/03/11 Consent granted    
AN/40/116 Tilbury Power Station Jetty change of use - importation of biomass fuel 18/02/11 Consent granted    
AS/27/448 Morden Wharf flood defence repairs 15/02/11 Consent granted    
AS/29/489 Vaizeys Wharf flood defence repairs 15/02/11 Consent granted    
AS/12/61 Ashlone Wharf works to tidal sluice 17/02/11 Consent granted    
AN/10/252 Chiswick Mall pontoon mooring for small boat 23/01/11 Consent granted    
AN/79/17 Fresh Wharf, Barking installation of new mooring 19/03/11 In progress    
AS/26/354 Borthwick Street, Deptford commercial use of slipway 17/03/11 In progress    
AEP/2/66 Eel Pie Island, Twickenham installation of pontoon and mooring 16/03/11 Consent granted    
AS/41/193 Marine Aggregate Terminal, Denton addition of a barge loading conveyor system 22/03/11 Consent granted    
AN/1/2 35 Strawberry Vale, Twickenham Installation of a floating pontoon & jetty with brow 31/03/11 Consent granted    
 AN/24/242 13 Blyths Wharf, Narrow Street installation of a new balcony 19/03/11 Consent granted    
AN/44/137 Oikos No. 1 Jetty strengthening works to jetty & dolphins 01/04/11 Consent granted    
A2/28/36  Bugsbys Reach mooring relocation  21/04/11 Consent granted    
AS/20/154 Golden Hinde Dock, Southwark repair & protection works 18/04/11 Consent granted    
AS/32/10 Borax Wharf, Belvedere jetty name change to 'Middleton Jetty' 12/05/11 Consent granted    
AS/26/417 Greenwich Pier installation of a roof over the existing pier pontoons 10/05/11 Consent granted    
AN/28/385 Brunswick Wharf various river uses 31/05/11 In progress    
AS/18/49 Southbank, Vauxhall Overhaul, renewal of transverse blocks 01/06/11 In progress    
AS/32/45 Fords Jetty repair, remedial works to jetty 17/05/11 Consent granted    
AN/19/713 Chrysanthemum Pier Access facilities to refurbish landing stage and pontoon 17/06/11 Consent granted    
 AN/78/29 Leamouth Peninsula construction of a pedestrian & cycle bridge  13/07/11 In progress    
AN/29/453 North Pier Woolwich Free Ferry installation of a new piled berthing dolphin 15/07/11 In progress    
AS/20/157 HMS Belfast/Queens Walk erectrion of new gangplank 27/07/11 In progress    
AN/20/134-AN/21/149 between Blackfriars and Tower Bridge floating river park/walkway 10/08/11 ON HOLD    
AS/40/165 Gravesend floating pontoon, steel piles and hinged brow 07/09/11 In progress    
AS/20/157 Queens Walk erection fo new admission point 31/08/11 In progress    
AN/10/290 Lower Mall, Hammersmith installation of access ladder, walkay, brow and pontoons for mooring  26/09/11 Consent granted    
AN/85/11 Benfleet Creek landing stage 08/09/11 In progress    
 AN/20/126 Cousin Lane Stairs refurbishment of stairs 09/09/11  Consent Granted    
AN/32/46 Beam River Pumping Station, Dagenham installation of steel access walkway 26/10/11 Consent granted    
A2/19/2 Hungerford Railway Bridge Installation of artwork 20/10/11 In progress    
AN/38/108 Port of Tilbury installation of 2 turbines 09/11/11 In progress    
AN/35/86 Purfleet Fuels Terminal Reburbishment of existing Ro-Ro jetty 25/10/11 Consent granted    
AS/29/491 construct new sheet piled flood wall Stone Wharf 24/11/11 Consent granted    
AS/08/34 Boat launching ramps and steps Kew 23/11/11 Consent granted    
AS/19/56 London Eye Pier Extension London Eye, Southbank 29/12/11 Consent granted    
AN/11/300 Distillery Wharf, Hammersmith installation of rowing pontoon 27/01/12 In progress    
AS/29/476 Greenwich yacht club installation of 8 additional mooring piles 05/03/12 In progress    
AS/20/157 replacement brow installation HMS Belfast 19/04/12 Consent granted    
             
             

For more information on any of the river works licence applications listed please contact the Deputy Licensing Officer on 01474 562354 or via this Enquiry Form.