Port of London Authority

River Works Licence Applications Received

Current list of River Works Licence applications received

Last update - 09/03/2010

PLA Ref No. Location Description of proposed works Date received Status Decision
AN/30/472 Lee Tunnel Outfall culvert 21/05/08 In progress  
AN/14/347 Watermans Quay, Fulham Riverwall repairs 22/09/08 In progress  
AS/33/18 Mulberry Wharf demo 2 mooring piles & pipeline 22/08/08 In progress  
AN/02/46-7 Twickenham Emb. Install fenders 02/09/08 In progress  
AN/01/10 99 Strawberry Vale, Twickenham Pontoon,brow & 2x piles  0809/08 In progress  
A2/20/2 Blackfriars Bridge Extension monitoring 10/09/08 In progress  
A2/40/36 Denton, Gravesend 2 mooring piles 12/09/08 In progress  
AN/79/42 Kingsbridge Whf,Barking Creek Remedial works 08/09/08  In progress  
 AS/07/25  Kew embankment  Remedial works  03/12/08 In progress  
AN/30/467 Gallions Point, Lead In Jetty jetty head & extension 19/11/08 In progress  
AS/15/101 & AS/30/101 Barnes - Beckton ST Works Boreholes 10/12/08 In progress  
A2/09/1 Barnes Railway Bridge Scaffold 18/12/08 In progress  
A2/83/36 Holehaven new works - mooring 14/01/09 In progress  
AS/33/20 Church Manorway, Erith jetties, moorings, piles & ramp 24/01/09 In progress  
AEP/02/5 Eel Pie Island, Twickenham 2 mooring posts 26/01/09 In progress  
AS/22/208 Unity Wharf 3 overhanging balconies (crane & lockum) 03/02/09 In progress  

AS/33/25

Erith construction of new steel jetty 10/02/09

In progress

 

AN/34/76-7 Mar Dyke, Purfleet public foot & cycle path bridge 25/02/09 In progress  
A2/43/126 Shellhaven install 20 piezometers 06/03/09 In progress  
AS/14/121-122 Oyster Wharf, Battersea install piles, pontoon & access bridge 20/03/09 In progress  
AN/35/84 Purfleet Pier jetty & various other works 11/03/09 In progress  
AS/29/517 Woolwich Woolwich free ferry 08/04/09 In progress  
AS/39/104-112 Bevans Wharf, Northfleet demolition of jetty crane & 3 chimneys 06/02/09 In progress  
AN/23/204-7 Metropolitan Wharf, Wapping Platform & loading lophole platforms 18/02/09 In progress  
AN/23/223 Phoenix Wharf balconies 27/04/09 In progress  
AS/76/17&18 46&47 49&51 AS/79/13 Deptford Creek flood defence repairs to 7 frontages/river walls 22/04/09 In progress  
AN/10/271 London, W6 2 moorings 05/05/09 In progress  
A2/20/2 Blackfriars repair, widen, & strengthen rail bridge 20/05/09 In progress  
A2/83/36 Holehaven Creek mooring no. 118 01/06/09 In progress  
A2/83/36 Holehaven Creek mooring no. 124 04/06/09 In progress  
AN/02/59 Twickenham steel pontoon, cone top & catwalk 08/06/09 In progress  
AS/76/28-29 & AS/76/30-31 Sun Wharf & Theatre Wharf repair of river wall 08/06/09 In progress  
AN/4/114A Isleworth barge grid 13/06/09 In progress  
AS/38/95 Britannia Refined Metals Wharf 9 piles & sheet piling 11/06/09 In progress  
AN/11/304-7 Thames Wharf & Palace Wharf flood defence repairs 03/07/09 In progress  
AS/15/146-7 Albion Riverside (Coupers Quay) moorings, gangways & walkways for barges 21/07/09 In progress  
AS/40/164 Gordon Promenade, Gravesend beach shingle replenishment 31/07/09 In progress  
 AN/14/344B Fulham Wharf pipes, concrete apron & pile supports  01/04/09  In progress  
 AS/15/130 Valiant House, Wandsworth removal of vegetation and repair marine wall  03/08/09  In progress  
AS/27/445-451 Syral UK, Greenwich demolition of silos & jetty 14/09/09 In progress  
AN/32/46A & AN/32/40A Dagenham pumping stations 03/09/09 In progress  
AN/06/148 & AN/06/150B Soaphouse Creek & River Brent, Brentford installation of leisure and commercial moorings 15/10/09 In progress  
AN/14/344A & AS/13/103 Wimbledon to Kensal Green Construction of cable tunnel 04/11/09 In progress  
AS/40/145 Town Pier, Gravesend Installation of pontoon 03/11/09 In progress  
A2/85/22 Benfleet Creek installation of new mooring 07/11/09 In progress    
AN/79/7, AN/31/33A & AN/32/49 Oakentrough & Whitings Sluice, Barking - Buzzards Creek - Havering Sluice Refurbishment to tidal sluices 12/11/09 In progress    
AS/10/57 Londsdale Road, London SW1 refurb & redev and proposed new outfall 25/11/09 In progress    
AS/81/35 - AS/81/40A Dartford Creek realignment of flood wall and construction of new new walkway 25/11/09 In progress    
AN/15/361 Lots Road masonry replacement & repointing of river wall 09/12/09 In progess    
AN/44/137 Canvey Island maintenance repairs & strengthening of Oikos Jetty No. 1 09/12/09 In progress    
 AN/79/42-3 Kingsbridge Ind. Est. Barking extended works to frontages  02/12/09 Consent granted    
 AN/78/23  Orchard Wharf  flood defence improvements  01/12/09  In progress    
 AN/02/69A  Twickenham change of use to Passenger Pier  03/02/10  In progress    
AS/03/08 Twickenham new toilet facilities on pontoon 07/12/09 In progress    
AS/34/56A Erith removal of Clubship & installation of pontoon 17/02/10 In progress    
AS/33/25 Erith proposed new outfall & stilling basin 24/02/10 In progress    
AN/76/36-50 Deptford Creek various works 03/02/10 In progress    

For more information on any of the river works licence applications listed please contact the Licensing Officer on 01474 562267 or via this Enquiry Form.


PLA, London River House, Royal Pier Road, Gravesend. Kent DA12 2BG Tel. +44 (0) 1474 562200