Port of London Authority

Notice to Mariners

M27 of 2006  No.4 Arch Closed to Navigation

The construction of the temporary vessel mooring dolphins between the Battersea Power Station Jetty and Victoria Railway Bridge has been completed.

No 4 arch of Victoria Railway Bridge will remain closed to navigation until further notice and will be marked in accordance with the Port of London Authority River Byelaws 1978 (as amended) namely:

  • By day, three red discs 0.6 metres in diameter at the points of an equilateral triangle with the apex downwards and the base horizontal.
  • By night, three red lights in similar positions to the discs displayed by day.

Further details will be broadcast by London VTS on VHF Channel 14.


 
Date Published: 09-Aug-06


Ends

Owners, Agents and Charterers should ensure that the contents of this Notice are made known to the masters or persons in charge of their vessels or craft.
 
<< Back to Index
PLA, London River House, Royal Pier Road, Gravesend. Kent DA12 2BG Tel. +44 (0) 1474 562200
© 1998-2009 Port of London Authority and MSO.net