HORSE REACH - HAZARD TO NAVIGATION: Mariners are advised that a Hazard to Navigation caused by sunk vessel has been reported at Middleton moorings on the Richmond bank, adjacent to Richmond Canoe Club. The vessel is positioned outside of the authorised channel in the line of moorings. Mariners are advised to navigate this area with extreme caution and report any difference in position to London VTS.

Live Tides

All tide tools

NOTICES TO MARINERS

View all

Incident reporting

Life-threatening emergencies on the river:
Call 999 and ask for the Coastguard


For near miss, safety observations and incident reporting click below

 

Make a report

Case Study: National Grid asset inspection

High resolution photography offers unparalleled detail.

The Port of London Authority was commissioned by the National Grid Grain LNG as the principle contractor for the 2018 inspection and condition survey. the charted engineering company Marmus were subcontracted by the PLA to specify and direct inspection works.

Our high resolution photography allowed engineers unparalleled detail in reviewing hard-to-access structures. All photography is geo-tagged and mapped to fully secure google earth/GIS format -- giving engineers full high-res access for remote assessment.

High resolution panoramic photographic assets of key sections were also supplied -- enabling quick previews of potentially troublesome areas. In addition, we provided the client with 4K video to show each jetty in context.

High resolution panoramic photographic assets of key sections were also supplied -- enabling quick previews of potentially troublesome areas. In addition, we provided the client with 4K video to show each jetty in context -- above and below the waterline.

Diving works were undertaken by SeaLift and Marine plant provision, with support for all afloat operations by Whitstable Matine, both of which are experienced National Grid contractors.

A full ultrasonic thickness survey of 25% of piles both above and below the water level was undertaken and logged. The data and high resolution imagery was analysed against design and previous inspection data by Marmus to inform final asset condition reporting.

The combined data collection offers unprecedented ease of assessment for all stakeholders, from surveyor to engineer.

Essential information